Estimating

Takeoffs and estimates you can check line by line.

Our most-used service in full: what you can order, how it is priced, and what comes back.

Four ways to order an estimate

The first three build on each other: measured quantities, then costs, then your markup. A preliminary estimate is the rough early version for projects without full drawings.

Quantity takeoff

Measurements only, you do the pricing

Starts from
Your drawing set, with quantities split by trade and division.
How far it goes
Quantities only, no pricing
Good fit for
Subcontractors who price with their own crew rates and supplier numbers.
Deliverable
Measured areas, volumes, lengths, and counts, organized by trade and division.

Detailed estimate

The takeoff, fully priced

Starts from
A full set: architectural, structural, and MEP drawings with specifications.
How far it goes
Full cost, before your markup
Good fit for
Final budgets, lender and owner reviews, and tracking cost during the build.
Deliverable
Each item quantified and priced for material, labor, equipment, and waste.

Bid estimate

The priced estimate, ready to submit

Starts from
The full bid package, addenda, and your submission requirements.
How far it goes
Full cost plus overhead and profit
Good fit for
Contractors submitting on public or private projects.
Deliverable
Final pricing with overhead and profit applied, laid out to drop into your proposal.

Preliminary estimate

An early budget, before full drawings exist

Starts from
Early design: a program, sketches, or schematic drawings.
How far it goes
Rough budget, typically within ±20% to ±40%
Good fit for
Checking whether a project pencils out and setting a starting budget.
Deliverable
A budget broken down by building system, with assumptions listed.

Three deliverables on every project

Each estimate ships with the proof behind it, so you can verify the work before a bid goes out under your company's name.

Excel bid sheet

Materials, labor hours, equipment, and waste allowances, itemized with the sheet reference and CSI code. Built to paste into your proposal, or mapped into your own spreadsheet.

Color-coded PDF markups

Your drawings returned with each scope traced in its own color. When the sheet lists 168 LF of partitions, the PDF shows exactly which walls make up that number.

RFI log

Gaps and conflicts found in the documents, tied to a sheet and room, with the assumption we priced. You see them early enough to ask the design team before bids close.

Sample RFI log

Sample project: urgent care clinic, shown on our home page

RFISheet and locationQuestionStatus
RFI-01A-501, Room 105The lab ceiling isn't on the finish schedule, and exam rooms 102 to 104 call for ACT. Should the lab get washable vinyl-faced tile? Priced as standard 2' × 4' ACT.Open
RFI-02S-101, detail 2/S-301General notes show the perimeter footing 12" deep, and detail 2 shows 16". Which governs? Priced at 12" per the notes.Open
RFI-03A-601, door 6No hardware set is listed for the lab-to-staff door. Priced as a passage set with a closer.Answered
Floor plan drawings on a bench with a tape measure, level, and drill

Measured the way your trade bids

Each trade gets its own takeoff in the units it is bought and bid in. A full-project estimate is those trade totals added together.

Sitework & excavation

CSI Divisions 31 Earthwork, 32 Exterior Improvements, 33 Utilities

The first crews on site. We measure clearing, earthwork, trenches, and buried utilities from your civil sheets.

Quantities we take off

  • Excavation and fill balances in cubic yards
  • Trench and utility line lengths in linear feet
  • Asphalt and site concrete paving in square feet
  • Fine grading, aggregate base, and backfill

Vocabulary

Cut and fill, mass excavation, grading, utility trenching, haul-off

Hand off the earthwork math and put those hours into chasing more site packages.

Other scopes we take on: elevators, fencing, landscaping, piling, plaster, glass and glazing, flooring, paint and wallcovering, sheet metal, welding, process and site piping, and mechanical insulation.

Show all CSI divisions we estimate

Procurement and general

  • 00Procurement and contracting requirements
  • 01General requirements

Facility services

  • 21Fire suppression
  • 22Plumbing
  • 23Heating, ventilating, and air conditioning
  • 25Integrated automation
  • 26Electrical
  • 27Communications
  • 28Electronic safety and security

Facility construction

  • 02Existing conditions
  • 03Concrete
  • 04Masonry
  • 05Metals
  • 06Wood, plastics, and composites
  • 07Thermal and moisture protection
  • 08Openings
  • 09Finishes
  • 10Specialties
  • 11Equipment
  • 12Furnishings
  • 13Special construction
  • 14Conveying equipment

Site and infrastructure

  • 31Earthwork
  • 32Exterior improvements
  • 33Utilities
  • 34Transportation
  • 35Waterway and marine construction

Process equipment

  • 40Process interconnections
  • 41Material processing and handling equipment
  • 42Process heating, cooling, and drying equipment
  • 43Process gas and liquid handling
  • 44Pollution control equipment
  • 45Industry-specific manufacturing equipment
  • 46Water and wastewater equipment
  • 48Electrical power generation

Priced for where you build and who you hire

Material and equipment costs are matched to current pricing where the project is built. Labor follows how the job will really be staffed.

Open shop

Non-union labor at market rates. Most private work is priced this way, and rates change from state to state.

Union

Rates, fringes, and work rules come from the local collective bargaining agreement, for example an IBEW local on electrical work.

Prevailing wage

Required on federally funded construction by the Davis-Bacon Act: a published base rate plus fringes for each trade and county. On some jobs, labor lands close to twice the open-shop figure.

Overtime

Federal law requires time-and-a-half once a worker passes 40 hours in a week. Compressed schedules push labor costs up quickly.

Try it: switch the labor basis below and watch the same scope change price.

Sample bid sheet: urgent care clinic

Swipe left to see all columns. Item names stay in place.

ItemQuantityLaborMaterialTotals
DescriptionS#Dwg.CSI no. Qty.WastageQty w/ wasteUnit Unit labor hourTotal labor hourLabor wage / hourUnit labor costTotal labor cost Unit material costTotal material cost Unit price (L&M)Trade total
Direct cost$0
Labor$0
Material$0

Sample project with illustrative rates, not a quote. Bid estimates add overhead and profit (often 10% to 20%) on top of direct cost, while quantity takeoffs leave pricing to you. Colored squares match the scopes on the sample plan.

How each column is calculated
Qty w/ waste
Measured quantity plus the waste allowance for offcuts and damage.
Total labor hour
Quantity with waste multiplied by the hours needed per unit.
Unit labor cost
Hours per unit multiplied by the hourly wage.
Total labor cost
All labor hours for the line multiplied by the hourly wage.
Total material cost
Quantity with waste multiplied by the material price per unit.
Unit price (L&M)
Labor and material cost for one unit, combined.
Trade total
The line's full labor plus full material cost.
Dwg.
Sheet number where the item is drawn, so you can find it in the markups.
CSI no.
MasterFormat section for the item.

Have a set of drawings to price?

Send them over. You will get a fee and a delivery date by email before any work starts.

Get a free quote