Takeoffs and estimates you can check line by line.
Our most-used service in full: what you can order, how it is priced, and what comes back.
Four ways to order an estimate
The first three build on each other: measured quantities, then costs, then your markup. A preliminary estimate is the rough early version for projects without full drawings.
Quantity takeoff
Measurements only, you do the pricing
Starts from
Your drawing set, with quantities split by trade and division.
How far it goes
Quantities only, no pricing
Good fit for
Subcontractors who price with their own crew rates and supplier numbers.
Deliverable
Measured areas, volumes, lengths, and counts, organized by trade and division.
Each estimate ships with the proof behind it, so you can verify the work before a bid goes out under your company's name.
Excel bid sheet
Materials, labor hours, equipment, and waste allowances, itemized with the sheet reference and CSI code. Built to paste into your proposal, or mapped into your own spreadsheet.
Color-coded PDF markups
Your drawings returned with each scope traced in its own color. When the sheet lists 168 LF of partitions, the PDF shows exactly which walls make up that number.
RFI log
Gaps and conflicts found in the documents, tied to a sheet and room, with the assumption we priced. You see them early enough to ask the design team before bids close.
Sample RFI log
Sample project: urgent care clinic, shown on our home page
RFI
Sheet and location
Question
Status
RFI-01
A-501, Room 105
The lab ceiling isn't on the finish schedule, and exam rooms 102 to 104 call for ACT. Should the lab get washable vinyl-faced tile? Priced as standard 2' × 4' ACT.
Open
RFI-02
S-101, detail 2/S-301
General notes show the perimeter footing 12" deep, and detail 2 shows 16". Which governs? Priced at 12" per the notes.
Open
RFI-03
A-601, door 6
No hardware set is listed for the lab-to-staff door. Priced as a passage set with a closer.
Answered
Measured the way your trade bids
Each trade gets its own takeoff in the units it is bought and bid in. A full-project estimate is those trade totals added together.
Each pipe run, conduit path, and fixture gets its own line, so late revisions are easy to trace.
Other scopes we take on: elevators, fencing, landscaping, piling, plaster, glass and glazing, flooring, paint and wallcovering, sheet metal, welding, process and site piping, and mechanical insulation.
Show all CSI divisions we estimate
Procurement and general
00Procurement and contracting requirements
01General requirements
Facility services
21Fire suppression
22Plumbing
23Heating, ventilating, and air conditioning
25Integrated automation
26Electrical
27Communications
28Electronic safety and security
Facility construction
02Existing conditions
03Concrete
04Masonry
05Metals
06Wood, plastics, and composites
07Thermal and moisture protection
08Openings
09Finishes
10Specialties
11Equipment
12Furnishings
13Special construction
14Conveying equipment
Site and infrastructure
31Earthwork
32Exterior improvements
33Utilities
34Transportation
35Waterway and marine construction
Process equipment
40Process interconnections
41Material processing and handling equipment
42Process heating, cooling, and drying equipment
43Process gas and liquid handling
44Pollution control equipment
45Industry-specific manufacturing equipment
46Water and wastewater equipment
48Electrical power generation
Priced for where you build and who you hire
Material and equipment costs are matched to current pricing where the project is built. Labor follows how the job will really be staffed.
Open shop
Non-union labor at market rates. Most private work is priced this way, and rates change from state to state.
Union
Rates, fringes, and work rules come from the local collective bargaining agreement, for example an IBEW local on electrical work.
Prevailing wage
Required on federally funded construction by the Davis-Bacon Act: a published base rate plus fringes for each trade and county. On some jobs, labor lands close to twice the open-shop figure.
Overtime
Federal law requires time-and-a-half once a worker passes 40 hours in a week. Compressed schedules push labor costs up quickly.
Try it: switch the labor basis below and watch the same scope change price.
Sample bid sheet: urgent care clinic
Swipe left to see all columns. Item names stay in place.
Item
Quantity
Labor
Material
Totals
Description
S#
Dwg.
CSI no.
Qty.
Wastage
Qty w/ waste
Unit
Unit labor hour
Total labor hour
Labor wage / hour
Unit labor cost
Total labor cost
Unit material cost
Total material cost
Unit price (L&M)
Trade total
Direct cost$0
Labor$0
Material$0
Sample project with illustrative rates, not a quote. Bid estimates add overhead and profit (often 10% to 20%) on top of direct cost, while quantity takeoffs leave pricing to you. Colored squares match the scopes on the sample plan.
How each column is calculated
Qty w/ waste
Measured quantity plus the waste allowance for offcuts and damage.
Total labor hour
Quantity with waste multiplied by the hours needed per unit.
Unit labor cost
Hours per unit multiplied by the hourly wage.
Total labor cost
All labor hours for the line multiplied by the hourly wage.
Total material cost
Quantity with waste multiplied by the material price per unit.
Unit price (L&M)
Labor and material cost for one unit, combined.
Trade total
The line's full labor plus full material cost.
Dwg.
Sheet number where the item is drawn, so you can find it in the markups.
CSI no.
MasterFormat section for the item.
Have a set of drawings to price?
Send them over. You will get a fee and a delivery date by email before any work starts.